Repository logo
 
No Thumbnail Available
Publication

Future circular collider injection and extraction kicker topologies and solid state generators

Use this identifier to reference this record.
Name:Description:Size:Format: 
Future_LMRedondo.pdf1.39 MBAdobe PDF Download

Advisor(s)

Abstract(s)

A 100 TeV center-of-mass energy frontier proton collider, in a new tunnel of 80-100 km circumference, is a central part of CERN's Future Circular Colliders (FCC) design study. The designs of the injection and extraction systems of the FCC are initially based upon the parameters of the injection and extraction systems of the Large Hadron Collider and a preliminary study of the FCC beam optics and lattice. The injection and, in particular, the extraction systems of the FCC have to be highly reliable. In order to achieve high reliability, solid state switches will be used for the generators of the injection and extraction systems. This paper discusses topologies of these kicker systems, which are presently under consideration.

Description

Keywords

Circular collider injection Extraction kicker Solid state generators

Citation

BARNES, M. J.; [et al] – Future circular collider injection and extraction kicker topologies and solid state generators. Physical Review Accelerators and Beams. ISSN 2469-9888. Vol. 22, N.º 7 (2019), pp. 071001-1- 071001-12

Research Projects

Organizational Units

Journal Issue

Publisher

American Physical Society

CC License

Altmetrics